Peel Centre Re-Development

Residents of the Willow Gardens are being consulted on plans to re-develop part of the Peel Centre site (Hendon Police Training College). The details are as follows:


Development Management & Building Control Service
Building 4, North London Business Park
Oakleigh Road South
London
N11 1NP

Contact: Jason Traves
Tel: (020) 8359 3000
Email: planning.consultation@barnet.gov.uk
Date: 15th May 2015
Reference: H/04753/14

Dear Sir/Madam,

Town & Country Planning Act 1990, The Town & Country Planning (Environmental Impact Assessment) Regulations 2011

SITE: Peel Centre, Peel Drive, Colindale, London, NW9 5JE

PROPOSAL: Hybrid planning application for the phased comprehensive re-development of part of the existing Peel Centre site including the demolition of all existing buildings and the prvision of a residential-led mixed use development comprising up to 2,900 new residential units (Use Class C3), with 888 units in full detail and up to 2,012 units in outline in buildings ranging from 2 – 21 storeys; up to 10,000 square metres of non-residential floor space (Use classes (A1 – A4, D1, D2); the provision of a 3 form entry primary school (including nursery provision) and a minimum of 4 hectares of public open space. Assoociated site preperation/enabling works, transport infrasturcture namwly a new pedestrian connection to Colindeep Lane and junction works, landscaping and car parking. The application is accompanied by an Environmental Statement.

MAY 2015 RE-CONSULTATION: Amended plans, elevations and landscape drawings and schedules for blocks in the detailed component; amended parametre plans and Revised Design Principles Document for the outline component; Revised Illustrative Masterplan; Updated supporting documents including: Planning Application Specification Document; Planning Application Specification Addendum; Revised Highway Drawings; Planning Statement – Statement of Conformity; Design and Access Statement Addendum Vols I, II, III; ES Statement of Conformity; ES Mitigation Register; Transport Statement Addendum Vols I and II; Supplementary Retail Report; Open; Open Space, Sports and Recreation Strategy Addendum; Satement of Conformity (Waste, Water and Utilities Technical); Sustainability Statement Addendum; Energy Statement Addendum; Peel Link Feasibility Studay; and Consultation Response Report

Further to my previous letter, please note that amended plans have been submitted in respect of the above planning application, and the description of the proposal has also changed. If you would like to look at the application, the easiest way is through our website, by following the link at https://publicaccess.barnet.gov.uk/online-applications and entering the application reference H/04753/14 or address into the Simple Search. The application can also be viewed at Barnet House, 1255 High Road, Whetstone, N20 0EJ.

All comments that have already been submitted will be taken into consideration. Any additional comments you wish to make on the application must be recieved in writing by 5th June 2015 in order to be considered when determining the applicaiton. Comments will form part of the public planning register. Please include your name, address, daytime telephone number and where available, email address in all correspondance and quote reference H/04753/14. Comments can be submitted via the website, or in writing to the address or email address at the top of this letter.

Should this application go before a committee, members of the public may address that committee, subject to certain conditions. If you want to address the committee, or be notified if the application will go before a committee, you must state clearly Request to Speak at the Planning Committee in bold at the top of the correspondance. We will then let you know about the meeting and about the rules for speaking to it. Most applications do not reach committee but are considered by officers who will review your written comments.

Any comments will be acknowledged if submitted by email or accompanied by a stamped addressed envelope, and if you comment, you will be informed of the final decision in writing.

Yours faithfully

Jason Traves
Principal Planning Officer
Major Projects Team

Leave a Reply